Forum Title: How would you do this Part 2
I'll take a chance on getting ripped but here goes?.. I need to look at a job tomorrow (If I'm up to it) for a contractor that involves removing 10 post that are through a roof. The roof I was told is torch down with alum. coat over it. They have to cut the deck around each post so they can bolt in new ones. Then I have to flash every thing back. Now I'm no torch guy unless it has a copper tip on It'so I need to know what I should do. Do I install some material in the low spot to bring it up level then patch over the whole area or is there another way. As for the post I was going to make pitch pocket like flashing?s that fit over the post and then flash them in
Category: Roofing Post By: MONICA LYNCH (Fall River, MA), 02/22/2018

Tips, Support & Resources For Homeowners

requestaquote Get Free Quotes callnow 888-610-8624